Sacramento RT Greenline (Township to Sacramento I International Airport)

Sacramento, CA

Morton & Pitalo was responsible for providing surveying and mapping services to AECOM as a part of the PAED phase of this new 9.5 mile extension of the Light Rail from Township 9 to the Sacramento International Airport. Services included: (1) establishing a primary control network; (2) establishing 38 aerial control panels and locating them with respect to the project control network.(3) Perform differential level surveys to establish elevations for the project and aerial control and (4) preparation of the aerial base mapping at a scale of 1”=50’. The GPS primary control network and secondary aerial mapping control was established in accordance with the Caltrans Survey Manual procedures, accuracy standards and requirements for GPS surveys and Digital Differential Leveling surveys. In addition, supplemental designs surveys have been provided for the light rail expansion into the “Railyards”. These services included an aerial topographic survey for a portion of the Railyards and detail topographic surveys for portions of 5th, 6th, 7th, F, G, and H Streets.

Client: AECOM

Fulton Avenue Redevelopment

Sacramento, CA

Morton & Pitalo, Inc. was the prime consultant for the conceptual phase of this redevelopment project that spans Fulton Avenue from Arden Way to Business 80. The work included preliminary engineering research and studies; preliminary landscape designs and alternatives; several community and business group meetings; two (2) charettes; and cost estimates for the reconstruction of Fulton Avenue, intersection improvements, landscape and visual enhancements. Following the project scoping process, Morton & Pitalo, Inc. prepared the Master Improvement Plan and 3 construction phases of the Master Plan. The improvement costs for Phase 1A and 1B were approximately $3.7M. Phase 1A was completed in 2001 and Phase 1B was completed in 2003. Improvement Plans for Phase 2, which will replace the overhead utility lines with an underground system, were completed by Morton & Pitalo, Inc. in 2006. The costs of the Phase 2 improvements are about at $5M. The project includes funding from several sources including monies from the Fulton Avenue Improvement Association (FAIA), the County of Sacramento and TEA 21 funds from the State of California.

Client:Sacramento County Public Works, Department of Transportation
Gross Site Area: Varies
Year Completed: Phase 1A – 2001, Phase 1B – 2003, Phase 2006

REPRESENTATIVE PROJECTS

BERRY STREET
BLUE RT
CHP BAKERFIELD & MOJAVE
CONFERENCE CENTER DRIVE
EAST MAIN STREET
FULTON AVENUE
GOLD RT
GREEN RT
MATHER FIELD EAST (EDA)
N. FIRST STREET
NAVY BRIDGEPORT & SAN DIEGO
RT + 8 STATIONS
VERNON STREET

SERVING OUR CLIENTS TO BUILD A BETTER COMMUNITY

Professional civil engineering, land planning and land surveying services.

Folsom Office: 600 Coolidge Drive, Suite 140, Folsom, CA 95630
Fresno Office:  7643 North Ingram Ave., Suite 105, Fresno, CA 93711